Construction will begin on the following roads at the beginning of July:
- Oak Ridge Drive
- Riverside Drive
- Cove Lane
- White Oak Drive
Roads to be Seal Coated this Summer:
- East Cove
- Glen Ridge Drive
- Glen Court
- Glover Road
- High Ridge Drive
- Lundy Lane
- Meadow Valley Trail
- Meadow Valley Lane
- Meadow Valley Bay
- North Cove
- Salishan Drive
- Serenity Court
- Sykora Lane